top of page

85RA 1000 & 2000 Modular Buildings

The scope of work and required for that project is providing a detailed design and engineering, supply of materials, supply of labor, supervision, assembly, installation of free issued items, inspection, testing, resolving the punch list points, documentation and preparation for shipment of Two (2) E-House modular buildings.

Project Value: $10M

ICM Contractors acted as a 3rd party independent consultant to that project with Suncor Energy providing 3D modeling, baseline schedule, cost estimate, and a project matrix.

bottom of page